1 Stage – Construction of the fishery. The cost today of the screen and, R$23.00 approximately real the square meter. For the construction of the fishery with measures of 10×6 meters, being that he will be 10metros of length for 06 meters of width and 08 meters of height. Inside of the great fishery meters, being 02metros of width for 02 meters of length and 03 meters of height for acts of receiving of birds will have to be constructed (03) to three lesser fisheries with measures of 2×2. A clinic for carrying birds of infectious disease will have to be constructed or not. The total of the material is approach in 642 meters of screen, being that the value of the cost of the workmanship generates around R$45.000 real. The wood could be removed of horto forest thus the final cost diminishes, and the construction of the fishery is the expenditure of the city hall.
Today the appropriate place for the construction of the acquittal fishery would be horto forest for having a privileged area with fruitful bushes and trees, rivers lakes. 2 Stage? Acquittal the characteristic is to develop the final task of the selection process, identification whitewashing and wild after-acquittal of birds, where these birds will pass for place qualified for, readjustment and acquittal. RESULTS and QUARREL We believe that the accomplishments of acquittal of wild birds are crucial for the survival of the species, we can thus conclude that as public agency the city comes across with limitations of resources and materials, structures and human being, however, through the persistence of diverse partners, we can materialize this singelo however essential event, and wait to not only contribute for the spreading, but for the improvement of the work. Although incipient, it can be evidenced that in other cities, as Pirassununga/SP, is viable the wild acquittal of birds.